We are progressing well and have completed the curtain walling installation to 13 floors of the HMRC building for our client Galliford Try.

The mast climber ties are now being removed and infilled with glass and Rainscreen panels to 2 elevations. The Rainscreen cladding installation which is in full swing and started at the top of the building will now go back down, this allows the mast climber ties to be stripped out as the facade is being installed. The mast climbers are currently tied through glazing apertures at every second floor, once the tie is removed, the aperture is glazed from the floor slab internally.